MENU X
Model Corridor on Tonk Road; 13 km Left Free Movement


Model Corridor on Tonk Road; 13 km Left Free Movement

Technical study will be conducted for U-turns, crossing points, and cuts

To reduce increasing traffic congestion in the city, a 13 km long model traffic corridor will be developed in the first phase from Yadgar to Sanganer Pulia on Tonk Road.

A technical assessment of 16 intersections, junctions, and cuts on this route will be carried out to ensure left free movement, safe U-turns, crossing points, and junction improvements.

This project will be executed jointly by the Municipal Corporation and JDA. Necessary improvements will also be made in road design along the corridor.

Unnecessary and unsafe cuts (median openings) will be closed. Continuous footpaths will be constructed for pedestrians. The placement of U-turns and crossing points will be based on technical surveys.

Traffic Load at Major Intersections (Vehicles per hour)

  • Rambagh Circle: 14–15 thousand
  • Ajmeri Gate: 7–8 thousand
  • Gandhinagar Mod: 5–6 thousand
  • Laxmimandir Mod: 6–7 thousand

Signal Timing Will Be Dynamic

Traffic signal timings will be made dynamic based on real-time traffic conditions.

Along with this:

  • Junction improvements and redesign of cuts will be done
  • Roads will be made encroachment-free
  • Lane marking, zebra crossings, and stop lines will be properly defined
  • Illegal parking will be removed
  • Additional lanes will be developed where required
  • Clear parking and no-parking zones will be defined and notified


Model Traffic Corridor from Yadgar to Sanganer (13 km)

Work to Be Done at These Points

  1. Smart Traffic System
  • Adaptive traffic signals
  • CCTV surveillance
  • Monitoring and real-time updates
  1. Pedestrian Safety
  • Zebra crossings
  • FOBs (Foot Over Bridges) / Underpasses
  • Signal timing for pedestrians
  1. Public Transport
  • Bus priority lanes
  • Properly planned bus stops
  1. Road Design Improvements
  • Lane planning
  • Footpaths
  • Cycle tracks
  • Left-turn free movement
  • U-turns and cut points
  1. Parking Management
  • Removal of illegal roadside parking
  • Creation of designated parking zones
  • Removal of encroachments
  1. Signboards & Road Marking
  • Clear traffic signs
  • Lane markings
  • Speed limits and directional signs

Major Intersections and Junctions on the Route

Ajmeri Gate, Maharani College, Suchna Kendra, SMS Hospital, Central Park Mod, Narayan Singh Circle, OTS Circle, Rambagh Circle, Nagar Nigam Cut, Gandhinagar Intersection, Laxmi Mandir Intersection, Gandhi Nagar Railway Station Cut, Glass Factory Cut, Jaipuriya Cut, Takhte Shahi Nagar Cut, and Sitabari Cut.

 


You May Also Like

Jaipur has been placed in a high-risk earthquake zone, along with Alwar and Bhiwadi. Being classified as a high-risk zone means that earthquakes measuring 5 to 6 on the Richter scale may occur in these areas, which can cause serious damage, particularly to older buildings.

The Jaipur Literature Fest is going to be back this January 19-23, celebrating 10 years of its existence. Know about the speakers and the activities it has in store this time.

History, legends and beauty of the Jaipur city is set to lie in the cinema halls of the Jaipur city.

Artist Suvigya Sharma, who is famous for his Tanjore paintings, has recently done a portrait of the Sanjay Dutt family.

The inauguration of interstate air services is date to take place on July 1, 2016. In the initial phase of the commencement of these interstate air services which connect Jaipur International Airport to other airports, such planes will fly for 6 days in a week.